Sunday, July 13, 2014

Next in the task list

The list of things that need doing before I can get the body ready to go on are these:

Design and fit new diff cover for fuel hoses
Relocate the coil packs (see below)
Modify engine loom and re cover
Send electronic accelerator pedal to AK to make up pedal box
Replace rubber washer in polo heater valve
Measure and triangulate locations for the body cut outs for fuel filler and sender in the boot.
Same for gear lever position
Fit engine bay cladding
Fit heater matrix into body

So for the coil packs - they are not that attractive on top of the valve covers but more importantly I've already melted one of the spark lead boots where it touched the headers.

The IVA test won't like this so I need to move the coil packs and make up some different leads with a better routing away from the headers.

So lots to do in the coming months!

No comments:

Post a Comment